人妻无码久久精品人妻成人_亚洲精品第一国产综合精品99_极品白嫩少妇香蕉视频_欧美黄色片中文字亚洲国产欧美在线人成_亚洲国产精品第一区二区_亚洲中文字幕一区精品自拍_成人H无码动漫在线观看

Development course
stick to the original intention and start again after 40 years of hard struggle
Development course
Development course
Iron forging
Hardware machining
Distribution box assembly
Specialized in manufacturing power distribution equipment
High end equipment manufacturing industry cluster
"industry + finance, demand + technology" two wheel drive
From 1979 to 1984
Iron forging
1979
Mr. Hu Shijie returned home from Guangzhou with his son, and he chose the ancestral house of Hu’s commune to make iron. The scale of iron making business became more and more prosperous.
1983
The Hu family officially built the Hu’s blacksmith shop.
From 1985 to 1988
Hardware machining
1985
Shilong hardware factory was established and began to manufacuture hardware products, realizing the transformation from manual workshop to modern factory.
1988
Hu family contracted Shenshan agricultural machinery factory and established Lianxing hardware factory. Following the change of customer demand, the transformation from making distribution box shell to large-scale assembly of distribution box is realized.
From 1989 to 1990
Distribution box assembly
1989
In July, Guangzhou Shenshan Baiyun Electric Equipment Factory was established to produce low-voltage switchgear and formally enter the electrical field.
1989
On Sep. 8th, the first retail store named Dade Store was established.
From 1991 to 2001
Specialized in manufacturing power distribution equipment
1993
Won the bid for low voltage project of First Peoples Hospital in Guangzhou City, with the bidding amount of 5 million Yuan. This bid is the first large-scale order of Baiyun Electric in the initial stage of its establishment, marking that the low-voltage products have been officially recognized by the market.
1995
Under the guidance of the Ministry of Machinery Industry of the People's Republic of China and the Provincial Department of Machinery, Baiyun Electric has passed the high voltage certification, obtained the "red certificate" and "green certificate", officially started to produce medium voltage and low voltage switchgear.
1996
Guangzhou Baiyun Power Group Co., Ltd. was formally established, opening the road of group operation.
1997
The first phase plant of Baiyun Electric Shenshan Industrial Park was put into use to build a leading production base in the industry.
2000
Baiyun Electric began to carry out enterprise informatization construction, transforming traditional manufacturing industry with informatization, and obtained CIMS application demonstration enterprise certification of National 863 Plan.
2000
In April, the sales head office was officially established, marking that Baiyun Electric's marketing system entered a period of standardized construction.
From 2002 to 2014
High end equipment manufacturing industry cluster
2002
In May, Baiyun Electric and Toshiba established Guangzhou Toshiba Baiyun Electrical Equipment Co., Ltd. (GTBS), starting cooperation with international well-known companies.
2002
In August, Li Changchun, member of the Political Bureau of the CPC Central Committee and Secretary of the Guangdong Provincial Party Committee, accompanied by Huang Huahua, Secretary of the Guangzhou Municipal Party Committee, and Lin Shusen, mayor of Guangzhou City, visited Baiyun Power Group.
2004
In January, Baiyun Electric established Guangzhou Toshiba Baiyun Ryoki Power Electronics Co., Ltd. (GTMBU) jointly with Toshiba and Mitsubishi.
2004
In February, Baiyun Electric set up the third joint venture Guangzhou Toshiba Baiyun Control System Engineering Co., Ltd. (GTBE) with Toshiba.
2004
In November, Baiyun Electric was recognized as "Key Enterprise of Equipment Manufacturing Industry in Guangdong Province".
2004
In December, Baiyun Power Group reorganized Nanjing Electric Group (former Nanjing Electric Porcelain Factory) and established Nanjing base.
2004
In December, Baiyun Electric completed the joint-stock reform and established Guangzhou Baiyun Electric Equipment Co., Ltd.
2005
In July, Baiyun Power Group reorganized the vacuum interrupter business of Jinzhou State-owned No.777 General Factory and established Jinzhou base.
2006
In October, Baiyun Power Group reorganized Guilin Power Capacitor Plant and established Guilin base.
2008
Baiyun Power Group was recognized as "National Enterprise Technology Center", "National Testing Center" and "National Innovative Enterprise", forming a large number of R & D centers and experimental bases.
2009
In December, Guilin Power Capacitor Co., Ltd. won the first prize of "National Science and Technology Progress Award" for the project of "Development and Industrialization of Major Equipments for UHVDC Transmission".
2009
In December, Baiyun Power Group's UHV power capacitor production base was officially put into operation in Guilin, becoming the largest capacitor production base in the world.
2012
In February, when Wen Jiabao, member of the Standing Committee of the Political Bureau of the CPC Central Committee and Premier of the State Council, Visited Baiyun Electric, he encouraged Baiyun to continue to "try boldly and venture boldly".
2012
In April, Baiyun Power Group took part in the Hannover Messe and formally marched overseas. During the exhibition, Premier Wen Jiabao of the State Council and German Chancellor Angela Merkel visited the intelligent microgrid exhibition area of Baiyun Power Group.
2012
In December, the project of "Key Technology, Complete Equipment and Engineering Application of UHV AC Transmission" participated by Guilin Power Capacitor Co., Ltd. won the special prize of "National Science and Technology Progress Award".
2012
In December, Hu Deliang, chairman of Baiyun Power Group, attended the economic work conference chaired by General Secretary Xi Jinping in Guangdong. Mr. Xi encouraged the Baiyun that it takes a good blacksmith to make good steel.
2013
In March, BPG Science and Technology Building was officially completed and put into use, realizing the overall settlement of the group's Guangzhou headquarters, the state recognized enterprise technology center and other scientific research institutions, and becoming the group's control center, financial center, information center and innovation center.
From 2015 to present
"industry + finance, demand + technology" two wheel drive
2016
In January, Baiyun Power Group built a world leading glass insulator production line in Nanjing, with a world leading product qualification rate.
2016
In March, Baiyun Electric was listed on the main board of Shanghai Stock Exchange with the stock code of 603861.
2016
In March, Baiyun Electric won the bid of BT project for power supply system equipment of Guangzhou metro line 21, line 14 and knowledge city extension, with the bid amount of 1.439 billion Yuan.
2016
In November, Guangzhou Yangxin Technology Research Co., Ltd. was established as the core technology R & D and service platform for the transformation and upgrading of Baiyun Power Group.
2016
In November, Baiyun Electric won the "Quality Award of Guangzhou Mayor" and continued to promote the excellent performance model.
2017
In July, the CPC Guangzhou Baiyun Electric Park Committee was established to gather the spirit of striking iron and lead the innovation and transformation.
2017
In July, Baiyun Electric acquired 51% equity of Zhejiang Transformer Co., Ltd., a wholly-owned subsidiary of Wolong Electric Group Co., Ltd., and officially became the controlling shareholder of Zhejiang Baiyun Zhebian Electric Equipment Co., Ltd.
2017
In December, Guilin Power Capacitor Co., Ltd. participated in the UHV ±800kV DC Transmission Project, and won the "National Science and Technology Progress Special Award".
2018
In February, Baiyun Power Group became the largest shareholder of Rongxin Huike Electrical Technology Co., Ltd., holding 35.05% equity in total.
2018
In December, Baiyun Electric digital factory was put into trial production; in the same period, the company was recognized as “National Technological Innovation Demonstration Enterprise”, “National Pilot Enterprise of the Integration of Informatization and Industrialization Management System” and won the national patent award and the pilot demonstration project of the Ministry of Industry and Information Technology.
2019
In January, Baiyun Electric won the bid of 7.72 billion Yuan for the power supply system equipment and operation and maintenance service procurement project of Guangzhou rail transit new lines, marking the transformation and upgrading of Baiyun Electric to a system integration service provider.
2019
In June, Baiyun Mingde (Beijing) International Engineering Management Co., Ltd. was established, which is a major layout for Baiyun Power Group to develop overseas business and EPC business.
2019
In August, Guangzhou Baiyun Electric Equipment Co., Ltd., Guangzhou Metro Group Co., Ltd. and Guangzhou Yangxin Technology Research Co., Ltd. jointly developed the "Urban Rail Transit Power Supply Life Cycle Intelligent Operation and Maintenance Management System", which was appraised that the technology in the field of urban rail transit power supply operation and maintenance has reached the international leading level.
返回頂部
Copyright ? Guangzhou Baiyun Electric Equipment Co., Ltd. All Rights Reserved 粵ICP備05024257號-2